- Postcode districts
- SO30
- Nearby
- Eastleigh, Southampton and Hythe
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Hampshire
- Survey
- Free, at your home
What does a new bathroom design cost in Hedge End?
Design comes with the job: the survey, layout and itemised quote are free. In Hedge End, a complete designed, supplied and fitted bathroom typically costs £7,300–£13,500 including VAT. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Measured survey at home
Detailed design
- Product schedule
Full project
- Typical supply-and-fit total
Guide prices for Hedge End including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Hedge End
We cover every part of Hedge End, including SO30, and nearby Eastleigh (4.3 miles) and Southampton (4.5 miles).
Hedge End gets the same process as anywhere else: a free survey at your home and a written, itemised quote. If your Hedge End bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move. For loft rooms and sloping ceilings in Hedge End homes, the design checks head height where you stand, not just the floor area.
Most of Hampshire has hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A conversation about who uses the room, when, and what does not work about the current one
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
Decisions to make first
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

