- Postcode districts
- SO50, SO53
- Nearby
- Hedge End, Southampton and Romsey
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Hampshire
- Survey
- Free, at your home
What does a new bathroom design cost in Eastleigh?
Design comes with the job: the survey, layout and itemised quote are free. In Eastleigh, a complete designed, supplied and fitted bathroom typically costs £7,300–£13,500 including VAT. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Eastleigh including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Eastleigh
As well as Eastleigh itself (SO50 and SO53), we survey in Hedge End, Southampton and Romsey.
Homes in and around Eastleigh vary, so we look at the floor, the walls and the water system before we price anything. A design survey in Eastleigh covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork. For loft rooms and sloping ceilings in Eastleigh homes, the design checks head height where you stand, not just the floor area.
Water across much of Hampshire is hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- A conversation about who uses the room, when, and what does not work about the current one
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
Decisions to make first
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

