- Postcode districts
- PO9
- Nearby
- Emsworth, Waterlooville and South Hayling
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Hampshire
- Survey
- Free, at your home
What does a new bathroom design cost in Havant?
Design comes with the job: the survey, layout and itemised quote are free. In Havant, a complete designed, supplied and fitted bathroom typically costs £7,300–£13,500 including VAT. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Havant including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Havant
We work right across Havant — PO9 — and in neighbouring Emsworth and Waterlooville.
In Havant, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. If you are in Havant and weighing a bath against a walk-in shower, the layout options show both with their prices. A design survey in Havant covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork.
Water across much of Hampshire is hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
Decisions to make first
Storage
Fitted furniture, a vanity with a tall cupboard, or recessed niches and a mirror cabinet. Recessed storage costs no floor space but needs a stud wall or deep boxing to sit in.
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

