- Postcode districts
- PO11
- Nearby
- South Hayling, Emsworth and Havant
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Hampshire
- Survey
- Free, at your home
What does a new bathroom design cost in Hayling Island?
Design comes with the job: the survey, layout and itemised quote are free. In Hayling Island, a complete designed, supplied and fitted bathroom typically costs £7,300–£13,500 including VAT. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Measured survey at home
Detailed design
- Product schedule
Full project
- Typical supply-and-fit total
Guide prices for Hayling Island including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Hayling Island
We cover every part of Hayling Island, including PO11, and nearby South Hayling (0.5 miles) and Emsworth (4.6 miles).
Hayling Island gets the same process as anywhere else: a free survey at your home and a written, itemised quote. If you are in Hayling Island and weighing a bath against a walk-in shower, the layout options show both with their prices. If your Hayling Island bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move.
Supplies across most of Hampshire are hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
Decisions to make first
Storage
Fitted furniture, a vanity with a tall cupboard, or recessed niches and a mirror cabinet. Recessed storage costs no floor space but needs a stud wall or deep boxing to sit in.
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

