- Postcode districts
- PO11
- Nearby
- South Hayling, Emsworth and Havant
- Guide price
- £800–£2,800
- Typical time on site
- 1–2 working days (added to a fit)
- Water
- Hard across most of Hampshire
- Survey
- Free, at your home
What does bathroom underfloor heating cost in Hayling Island?
Our guide price for bathroom underfloor heating in Hayling Island is £800–£2,800 including VAT. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Electric mat
- Thermostat and RCD-protected supply
Electric, larger room
- Whole floor coverage
Wet system
- Manifold or single-zone kit
Guide prices for Hayling Island including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Hayling Island
As well as Hayling Island itself (PO11), we survey in South Hayling, Emsworth and Havant.
Hayling Island gets the same process as anywhere else: a free survey at your home and a written, itemised quote. If your Hayling Island bathroom has a cold tiled floor and no room for a bigger radiator, an electric mat under new tiles is the simplest answer. For Hayling Island homes having the bathroom floor replaced, underfloor heating adds one to two days to the fit.
Supplies across most of Hampshire are hard. Hard water leaves white marks on dark grout and gloss tiles, so matt finishes and stain-resistant grout are the practical choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A dial, programmable or smart thermostat, with the supply RCD protected, tested and certified by a qualified electrician
- A check of the floor construction, the room's heat loss and where the thermostat and supply will go
- The electric mat or cable laid to the open floor, kept clear of where the WC, bath and fixed furniture will sit
- Resistance and insulation tests on the mat before, during and after tiling, with the readings recorded
Decisions to make first
Electric or wet
Electric is cheaper to install and quick to lay in one room. Wet costs more upfront but is usually cheaper to run where it is fed by a gas boiler or heat pump.
Mat or loose cable
Mats are quickest on square, open floors. Loose cable is easier to route around awkward shapes, pipe boxing and a curved shower area.
Rules that apply in England
In England, a new circuit for underfloor heating is notifiable under Part P, and so is connecting it to an existing circuit in a room with a bath or shower. The electrician either self-certifies through a competent person scheme or the work is notified to building control.

