What does bathroom fitting cost in Hayling Island?
Guide price in Hayling Island: £2,500–£6,700 including VAT, depending on the room and what you choose. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Fit only, same layout
- Tiling labour
Fit only, new layout
- Pipework and waste re-routed
Supply and fit
- One price for everything
Guide prices for Hayling Island including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Hayling Island
In Hayling Island we cover PO11; we also cover South Hayling, 0.5 miles away, and Emsworth.
Being a smaller town does not change how we work in Hayling Island: free survey, written quote, one team. If your Hayling Island home runs on a combi boiler or an unvented cylinder, we check your chosen shower valve suits it before fitting. We survey in Hayling Island before quoting fit-only work, so the soil stack, supplies and walls are checked against the products you have chosen.
Supplies across most of Hampshire are hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Boarding, tanking in the shower area and tiling labour, with tiles and adhesive from you or sourced by us
- Unpacking and checking delivered items before day one, so damage or missing parts can go back to the seller early
- A check of your product list against the room and the plumbing before the job is booked
- First and second-fix plumbing: supplies, wastes, isolation valves and the connection to the soil stack
Decisions to make first
Who buys the materials
Adhesive, grout, boards, tanking, wastes and fixings can come from you or from us. The quote says which, so nothing is assumed.
Same layout or new
Keeping the layout keeps labour in the £2,200 to £4,000 range; moving the WC, shower or basin adds pipework and days.
Rules that apply in England
In England, the Water Supply (Water Fittings) Regulations 1999 apply to the products you supply as well as to the installation. Electrical changes such as new lights or a fan are notifiable under Part P and are done by a registered electrician or notified to building control. New drainage or a new connection to the soil stack can be Part H work.