- Postcode districts
- HR9
- Nearby
- Ledbury, Hereford and Gloucester
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Moderately hard across most of Herefordshire
- Survey
- Free, at your home
What does a new bathroom design cost in Ross on Wye?
Design comes with the job: the survey, layout and itemised quote are free. In Ross on Wye, a complete designed, supplied and fitted bathroom typically costs £6,400–£11,750 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Ross on Wye including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Ross on Wye
In Ross on Wye we cover HR9; we also cover Ledbury, 10.2 miles away, and Hereford.
Being a smaller town does not change how we work in Ross on Wye: free survey, written quote, one team. Whether you are in Ross on Wye or elsewhere in Herefordshire, layout options come with an itemised written quote. A design survey in Ross on Wye covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork.
Water across much of Herefordshire is moderately hard. Easy-clean glass and good-quality brassware are money well spent. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A conversation about who uses the room, when, and what does not work about the current one
Decisions to make first
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

