- Postcode districts
- GL1, GL2, GL4
- Nearby
- Cheltenham, Stroud and Tewkesbury
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Gloucestershire
- Survey
- Free, at your home
What does a new bathroom design cost in Gloucester?
Design comes with the job: the survey, layout and itemised quote are free. In Gloucester, a complete designed, supplied and fitted bathroom typically costs £6,600–£12,250 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Gloucester including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Gloucester
We cover every part of Gloucester, including GL1, GL2 and GL4, and nearby Cheltenham (7.4 miles) and Stroud (8.2 miles).
Gloucester is a big place with every kind of home, from terraces to flats to new builds, so we never price from a photo alone. A design survey in Gloucester covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork. If you are in Gloucester and weighing a bath against a walk-in shower, the layout options show both with their prices.
Most of Gloucestershire has hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
Decisions to make first
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Tile setting-out
Centring tiles on the window, basin or niche avoids thin slivers at the edges. Large tiles mean fewer joints but need flatter walls.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

