- Postcode districts
- GL50, GL51, GL53
- Nearby
- Tewkesbury, Gloucester and Stroud
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Gloucestershire
- Survey
- Free, at your home
What does a new bathroom design cost in Cheltenham?
Design comes with the job: the survey, layout and itemised quote are free. In Cheltenham, a complete designed, supplied and fitted bathroom typically costs £6,600–£12,250 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Cheltenham including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Cheltenham
We cover every part of Cheltenham, including GL50, GL51 and GL53, and nearby Tewkesbury (7.2 miles) and Gloucester (7.4 miles).
Cheltenham has a wide mix of house ages, so the survey is where we spot old lead pipework, weak joists or a tight soil stack. A design survey in Cheltenham covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork. We measure Cheltenham bathrooms on site before drawing anything, so layouts are based on your walls rather than a standard plan.
Most of Gloucestershire has hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- A conversation about who uses the room, when, and what does not work about the current one
Decisions to make first
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Storage
Fitted furniture, a vanity with a tall cupboard, or recessed niches and a mirror cabinet. Recessed storage costs no floor space but needs a stud wall or deep boxing to sit in.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

