Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Gloucestershire · GL50

Bathroom design in Cheltenham

Need a new bathroom design in Cheltenham? We plan it around your room and your budget, then do the whole job with one team and one contract.

Included with supply and fitsurvey visit plus designFree home survey
Bathroom design plan with tile samples and measurements, example for Cheltenham
Postcode districts
GL50, GL51, GL53
Nearby
Tewkesbury, Gloucester and Stroud
Guide price
Included with supply and fit
Typical time on site
survey visit plus design
Water
Hard across most of Gloucestershire
Survey
Free, at your home

What does a new bathroom design cost in Cheltenham?

Design comes with the job: the survey, layout and itemised quote are free. In Cheltenham, a complete designed, supplied and fitted bathroom typically costs £6,600–£12,250 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.

Detailed design

Included with supply and fit
  • Lighting and electrical plan

Full project

£6,600–£12,250
  • Design, supply and fit

Guide prices for Cheltenham including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Cheltenham

We cover every part of Cheltenham, including GL50, GL51 and GL53, and nearby Tewkesbury (7.2 miles) and Gloucester (7.4 miles).

Cheltenham has a wide mix of house ages, so the survey is where we spot old lead pipework, weak joists or a tight soil stack. A design survey in Cheltenham covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork. We measure Cheltenham bathrooms on site before drawing anything, so layouts are based on your walls rather than a standard plan.

Most of Gloucestershire has hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
  • A clear view of which changes are cheap and which mean moving drainage or opening floors
  • Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
  • A conversation about who uses the room, when, and what does not work about the current one

Decisions to make first

Keep or change the layout

Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.

Storage

Fitted furniture, a vanity with a tall cupboard, or recessed niches and a mirror cabinet. Recessed storage costs no floor space but needs a stud wall or deep boxing to sit in.

Rules that apply in England

In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

More about bathroom design

Bathroom design in Cheltenham: questions

Do you charge for bathroom design in Cheltenham?

Not separately. The home survey, layout options and itemised written quote are free, and the detailed design is part of a supply-and-fit job. A complete designed, supplied and fitted bathroom in Cheltenham typically costs £6,600–£12,250 including VAT.

How long does a new bathroom design take?

Allow survey visit plus design on site for most jobs, plus the lead time for products after you approve the quote. We give you a day-by-day plan before work starts in Cheltenham.

Is the home survey in Cheltenham really free?

Yes. We visit, measure the room, check the pipework, drainage and electrics, and talk through what you want. You then get a written, itemised quote with no obligation to go ahead.

Do you cover GL50 in Cheltenham?

Yes. We cover all of Cheltenham, including GL50, GL51 and GL53, and nearby Tewkesbury, Gloucester and Stroud. Survey visits are free and arranged at a time that suits you.

Which bathroom layout changes cost the most?

Moving the WC is usually the costliest single change, because it connects to the soil stack through a 110 mm waste that needs a steady fall. Forming a level-access shower floor and moving a door or wall also add significant cost. Moving a basin a short distance, or swapping a bath for a shower in the same space, costs much less.

Bathroom design in Cheltenham

Book a free home survey in Cheltenham. You get a measured layout and an itemised written price before anything is ordered.