- Postcode districts
- WR11
- Nearby
- Tewkesbury, Stratford-upon-Avon and Worcester
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Moderately hard across most of Worcestershire
- Survey
- Free, at your home
What does a new bathroom design cost in Evesham?
Design comes with the job: the survey, layout and itemised quote are free. In Evesham, a complete designed, supplied and fitted bathroom typically costs £6,400–£11,750 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Evesham including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Evesham
In Evesham we cover WR11; we also cover Tewkesbury, 11.3 miles away, and Stratford-upon-Avon.
In Evesham, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. A design survey in Evesham covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork. If your Evesham bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move.
Most of Worcestershire has moderately hard water. Easy-clean glass and good-quality brassware are money well spent. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
Decisions to make first
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

