- Postcode districts
- CV37
- Nearby
- Warwick, Royal Leamington Spa and Kenilworth
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Warwickshire
- Survey
- Free, at your home
What does a new bathroom design cost in Stratford-upon-Avon?
Design comes with the job: the survey, layout and itemised quote are free. In Stratford-upon-Avon, a complete designed, supplied and fitted bathroom typically costs £6,400–£11,750 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Stratford-upon-Avon including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Stratford-upon-Avon
In Stratford-upon-Avon we cover CV37; we also cover Warwick, 8.2 miles away, and Royal Leamington Spa.
In Stratford-upon-Avon, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. If you are in Stratford-upon-Avon and weighing a bath against a walk-in shower, the layout options show both with their prices. We measure Stratford-upon-Avon bathrooms on site before drawing anything, so layouts are based on your walls rather than a standard plan.
Supplies across most of Warwickshire are hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
Decisions to make first
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

