- Postcode districts
- CV34
- Nearby
- Royal Leamington Spa, Kenilworth and Stratford-upon-Avon
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Warwickshire
- Survey
- Free, at your home
What does a new bathroom design cost in Warwick?
Design comes with the job: the survey, layout and itemised quote are free. In Warwick, a complete designed, supplied and fitted bathroom typically costs £6,400–£11,750 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Warwick including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Warwick
We cover every part of Warwick, including CV34, and nearby Royal Leamington Spa (2.7 miles) and Kenilworth (4.6 miles).
Homes in and around Warwick vary, so we look at the floor, the walls and the water system before we price anything. If your Warwick bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move. For loft rooms and sloping ceilings in Warwick homes, the design checks head height where you stand, not just the floor area.
Supplies across most of Warwickshire are hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- A conversation about who uses the room, when, and what does not work about the current one
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
Decisions to make first
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

