- Postcode districts
- GL7
- Nearby
- Stroud, Cheltenham and Swindon
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Gloucestershire
- Survey
- Free, at your home
What does a new bathroom design cost in Cirencester?
Design comes with the job: the survey, layout and itemised quote are free. In Cirencester, a complete designed, supplied and fitted bathroom typically costs £6,600–£12,250 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Cirencester including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Cirencester
We cover every part of Cirencester, including GL7, and nearby Stroud (10 miles) and Cheltenham (13.3 miles).
Cirencester gets the same process as anywhere else: a free survey at your home and a written, itemised quote. Whether you are in Cirencester or elsewhere in Gloucestershire, layout options come with an itemised written quote. A design survey in Cirencester covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork.
Supplies across most of Gloucestershire are hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A conversation about who uses the room, when, and what does not work about the current one
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
Decisions to make first
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

