- Postcode districts
- GL7
- Nearby
- Stroud, Cheltenham and Swindon
- Guide price
- £6,100–£12,250
- Typical time on site
- 5–10 working days
- Water
- Hard across most of Gloucestershire
- Survey
- Free, at your home
What does a wet room cost in Cirencester?
Guide price in Cirencester: £6,100–£12,250 including VAT, depending on the room and what you choose. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Floor former and linear or centre drain
Signature
- Underfloor heating option
Large or luxury
- Full conversion of a larger room
Guide prices for Cirencester including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Cirencester
In Cirencester we cover GL7; we also cover Stroud, 10 miles away, and Cheltenham.
Cirencester gets the same process as anywhere else: a free survey at your home and a written, itemised quote. In a compact Cirencester bathroom, a wet room frees the space a tray and enclosure would take, but expect the whole floor to get wet. For a wet room in a Cirencester flat, the first step is the lease, because freeholder consent is often needed before any work starts.
Water across much of Gloucestershire is hard. If your supply in Cirencester is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Slip-resistant porcelain floor tiles and wall tiling
- A pre-formed floor former with a linear or centre drain, or a screed laid to fall
- A thermostatic shower valve, exposed or concealed, with heads to suit your water system
- Strip-out, waste removal, a final flow test to the drain and handover
Decisions to make first
Open or screened
A fully open shower with no glass only works in a larger room, with the basin, WC and towels well away from the spray.
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

