- Postcode districts
- PO36
- Nearby
- Ryde, Newport and Cowes
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of the Isle of Wight
- Survey
- Free, dates by arrangement
What does a new bathroom design cost in Sandown?
Design comes with the job: the survey, layout and itemised quote are free. In Sandown, a complete designed, supplied and fitted bathroom typically costs £7,300–£13,500 including VAT. Labour costs in South East England put local prices at about 12% above the UK guide figure. Travel and delivery to islands and remote areas are priced on your quote. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Measured survey at home
Detailed design
- Product schedule
Full project
- Typical supply-and-fit total
Guide prices for Sandown including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Sandown
In Sandown we cover PO36; we also cover Ryde, 5.4 miles away, and Newport. Because Sandown is further afield, we arrange survey visits in batches; tell us your timescale and we will confirm a date before you commit to anything.
Being a smaller town does not change how we work in Sandown: free survey, written quote, one team. If you are in Sandown and weighing a bath against a walk-in shower, the layout options show both with their prices. If your Sandown bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move.
Water across much of the Isle of Wight is hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
Decisions to make first
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

