- Postcode districts
- PO30, PO32, PO33
- Nearby
- Cowes, Ryde and Sandown
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of the Isle of Wight
- Survey
- Free, dates by arrangement
What does a new bathroom design cost in Newport?
Design comes with the job: the survey, layout and itemised quote are free. In Newport, a complete designed, supplied and fitted bathroom typically costs £7,300–£13,500 including VAT. Prices in South East England run at about 12% above the national guide, mainly because of labour rates. Travel and delivery to islands and remote areas are priced on your quote. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Newport including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Newport
In Newport we cover PO30, PO32 and PO33; we also cover Cowes, 4.2 miles away, and Ryde. Because Newport is further afield, we arrange survey visits in batches; tell us your timescale and we will confirm a date before you commit to anything.
Newport gets the same process as anywhere else: a free survey at your home and a written, itemised quote. Whether you are in Newport or elsewhere in the Isle of Wight, layout options come with an itemised written quote. For loft rooms and sloping ceilings in Newport homes, the design checks head height where you stand, not just the floor area.
Supplies across most of the Isle of Wight are hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- A conversation about who uses the room, when, and what does not work about the current one
Decisions to make first
Tile setting-out
Centring tiles on the window, basin or niche avoids thin slivers at the edges. Large tiles mean fewer joints but need flatter walls.
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

