- Postcode districts
- CT19, CT20
- Nearby
- Dover, Ashford and Deal
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Very hard across most of Kent
- Survey
- Free, at your home
What does a new bathroom design cost in Folkestone?
Design comes with the job: the survey, layout and itemised quote are free. In Folkestone, a complete designed, supplied and fitted bathroom typically costs £7,300–£13,500 including VAT. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Folkestone including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Folkestone
In Folkestone we cover CT19 and CT20; we also cover Dover, 7 miles away, and Ashford.
In Folkestone, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. If you are in Folkestone and weighing a bath against a walk-in shower, the layout options show both with their prices. Whether you are in Folkestone or elsewhere in Kent, layout options come with an itemised written quote.
Water across much of Kent is very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
Decisions to make first
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Storage
Fitted furniture, a vanity with a tall cupboard, or recessed niches and a mirror cabinet. Recessed storage costs no floor space but needs a stud wall or deep boxing to sit in.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

