- Postcode districts
- CT19, CT20
- Nearby
- Dover, Ashford and Deal
- Guide price
- £500–£3,900
- Typical time on site
- half a day to 3 days
- Water
- Very hard across most of Kent
- Survey
- Free, at your home
What does a new shower cost in Folkestone?
In Folkestone, a new shower typically costs £500–£3,900 including VAT, based on South East England prices. Prices in South East England run at about 12% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Shower swap
- Test and handover
New shower over bath
- Thermostatic bar shower and riser
New shower with enclosure
- Pipework and waste
Guide prices for Folkestone including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Folkestone
We work right across Folkestone — CT19 and CT20 — and in neighbouring Dover and Ashford.
Homes in and around Folkestone vary, so we look at the floor, the walls and the water system before we price anything. For Folkestone homes with a cold tank in the loft, we check the system before fitting anything, because a pump is only allowed on a gravity supply. If your Folkestone bath has no shower over it, a thermostatic bar shower, screen and tiling can usually be added in a day or two.
Most of Kent has very hard water. If your supply in Folkestone is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A check of your hot-water system, water pressure and flow rate
- For an electric shower, a check of the consumer unit and whether a new dedicated circuit is needed
- Electrical connection by a qualified electrician, tested and certified
- A bath screen, tray or enclosure where the shower is new
Decisions to make first
Head and handset
A handset on a riser rail is versatile and easy for rinsing; a fixed overhead head feels generous but needs strong flow behind it.
Exposed or concealed
An exposed bar valve fixes onto the tiles and is easy to service. A concealed valve sits in the wall for a cleaner look but needs careful setting-out and a plan for access.
Rules that apply in England
In England, an electric shower usually needs its own dedicated circuit, often 40 to 45 amps for an 8.5 to 10.5 kW unit, and a new circuit is notifiable under Part P. The Part G limit of 48 °C applies to a new bath in a new dwelling or one created by change of use, not to a shower, but a thermostatic valve gives similar protection. An unvented cylinder fitted to improve the shower must be installed by a G3-qualified installer.

