- Postcode districts
- CT14
- Nearby
- Dover, Ramsgate and Broadstairs
- Guide price
- £500–£3,900
- Typical time on site
- half a day to 3 days
- Water
- Very hard across most of Kent
- Survey
- Free, at your home
What does a new shower cost in Deal?
Our guide price for a new shower in Deal is £500–£3,900 including VAT. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Shower swap
- Test and handover
New shower over bath
- Thermostatic bar shower and riser
New shower with enclosure
- Pipework and waste
Guide prices for Deal including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Deal
In Deal we cover CT14; we also cover Dover, 7.8 miles away, and Ramsgate.
Homes in and around Deal vary, so we look at the floor, the walls and the water system before we price anything. If the shower in your Deal home swings between hot and cold, a thermostatic valve is usually the fix. If you want a shower in your Deal home that works when the boiler is off, an electric shower is worth considering, as long as the consumer unit can take the circuit.
Water across much of Kent is very hard. If your supply in Deal is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A bath screen, tray or enclosure where the shower is new
- New pipework and isolation valves, plus a pump only where the system is gravity-fed from a cold tank
- Removal of the old shower, a full-flow test and a handover on isolating and descaling it
- For an electric shower, a check of the consumer unit and whether a new dedicated circuit is needed
Decisions to make first
Electric shower
Heats cold mains water as it flows, so it works without stored hot water. Higher kW units give more flow; 8.5 to 10.5 kW models need a dedicated circuit, often 40 to 45 amps.
Digital shower
A wall panel sets the exact temperature and flow, while the mixing valve sits out of sight. It needs a power supply and suits a clean, concealed look.
Rules that apply in England
In England, an electric shower usually needs its own dedicated circuit, often 40 to 45 amps for an 8.5 to 10.5 kW unit, and a new circuit is notifiable under Part P. The Part G limit of 48 °C applies to a new bath in a new dwelling or one created by change of use, not to a shower, but a thermostatic valve gives similar protection. An unvented cylinder fitted to improve the shower must be installed by a G3-qualified installer.

