- Postcode districts
- ML5
- Nearby
- Airdrie, Bellshill and Motherwell
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Soft across most of Lanarkshire
- Survey
- Free, at your home
What does a new bathroom design cost in Coatbridge?
Design comes with the job: the survey, layout and itemised quote are free. In Coatbridge, a complete designed, supplied and fitted bathroom typically costs £6,200–£11,500 including VAT. Prices in Scotland run at about 4% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Coatbridge including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Coatbridge
We cover every part of Coatbridge, including ML5, and nearby Airdrie (1.7 miles) and Bellshill (3.2 miles).
In Coatbridge, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. A design survey in Coatbridge covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork. If you are in Coatbridge and weighing a bath against a walk-in shower, the layout options show both with their prices.
Water across much of Lanarkshire is soft. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
Decisions to make first
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Rules that apply in Scotland
In Scotland, a straight refit rarely needs a building warrant, but forming a new bathroom, altering drainage or structural work may. The Technical Handbook uses 15 l/s extract for a bathroom, and the Scottish Water Byelaws 2014 cover new water fittings.

