- Postcode districts
- FY2, FY3, FY6
- Nearby
- Blackpool, Thornton-Cleveleys and Lytham St Annes
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Soft across most of Lancashire
- Survey
- Free, at your home
What does a new bathroom design cost in Poulton-le-Fylde?
Design comes with the job: the survey, layout and itemised quote are free. In Poulton-le-Fylde, a complete designed, supplied and fitted bathroom typically costs £6,100–£11,250 including VAT. We adjust the national guide for North West England, where prices are typically about 6% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Poulton-le-Fylde including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Poulton-le-Fylde
We cover every part of Poulton-le-Fylde, including FY2, FY3 and FY6, and nearby Blackpool (3 miles) and Thornton-Cleveleys (3.2 miles).
Being a smaller town does not change how we work in Poulton-le-Fylde: free survey, written quote, one team. If you are in Poulton-le-Fylde and weighing a bath against a walk-in shower, the layout options show both with their prices. If your Poulton-le-Fylde bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move.
Supplies across most of Lancashire are soft. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A conversation about who uses the room, when, and what does not work about the current one
Decisions to make first
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Tile setting-out
Centring tiles on the window, basin or niche avoids thin slivers at the edges. Large tiles mean fewer joints but need flatter walls.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

