- Postcode districts
- DN15, DN16, DN17
- Nearby
- Brough, Goole and Thorne
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Lincolnshire
- Survey
- Free, at your home
What does a new bathroom design cost in Scunthorpe?
Design comes with the job: the survey, layout and itemised quote are free. In Scunthorpe, a complete designed, supplied and fitted bathroom typically costs £6,200–£11,500 including VAT. Prices in East Midlands run at about 4% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Scunthorpe including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Scunthorpe
We work right across Scunthorpe — DN15, DN16 and DN17 — and in neighbouring Brough and Goole.
Scunthorpe has a wide mix of house ages, so the survey is where we spot old lead pipework, weak joists or a tight soil stack. We measure Scunthorpe bathrooms on site before drawing anything, so layouts are based on your walls rather than a standard plan. For loft rooms and sloping ceilings in Scunthorpe homes, the design checks head height where you stand, not just the floor area.
Most of Lincolnshire has hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
Decisions to make first
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

