- Postcode districts
- DE7, DE75, NG16
- Nearby
- Ilkeston, Heanor and Ripley
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Nottinghamshire
- Survey
- Free, at your home
What does a new bathroom design cost in Eastwood?
Design comes with the job: the survey, layout and itemised quote are free. In Eastwood, a complete designed, supplied and fitted bathroom typically costs £6,200–£11,500 including VAT. We adjust the national guide for East Midlands, where prices are typically about 4% below the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Measured survey at home
Detailed design
- Product schedule
Full project
- Typical supply-and-fit total
Guide prices for Eastwood including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Eastwood
In Eastwood we cover DE7, DE75 and NG16; we also cover Ilkeston, 2.1 miles away, and Heanor.
Being a smaller town does not change how we work in Eastwood: free survey, written quote, one team. If your Eastwood bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move. For loft rooms and sloping ceilings in Eastwood homes, the design checks head height where you stand, not just the floor area.
Most of Nottinghamshire has hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- A conversation about who uses the room, when, and what does not work about the current one
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
Decisions to make first
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

