- Postcode districts
- S25
- Nearby
- Maltby, Worksop and Rotherham
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Moderately hard across most of South Yorkshire
- Survey
- Free, at your home
What does a new bathroom design cost in Dinnington?
Design comes with the job: the survey, layout and itemised quote are free. In Dinnington, a complete designed, supplied and fitted bathroom typically costs £6,000–£11,250 including VAT. Prices in Yorkshire and the Humber run at about 7% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Dinnington including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Dinnington
We cover every part of Dinnington, including S25, and nearby Maltby (3.5 miles) and Worksop (5.5 miles).
Being a smaller town does not change how we work in Dinnington: free survey, written quote, one team. A design survey in Dinnington covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork. If you are in Dinnington and weighing a bath against a walk-in shower, the layout options show both with their prices.
Water across much of South Yorkshire is moderately hard. Easy-clean glass and good-quality brassware are money well spent. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
Decisions to make first
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Tile setting-out
Centring tiles on the window, basin or niche avoids thin slivers at the edges. Large tiles mean fewer joints but need flatter walls.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

