- Postcode districts
- S25, S66
- Nearby
- Dinnington, Conisbrough and Rotherham
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Moderately hard across most of South Yorkshire
- Survey
- Free, at your home
What does a new bathroom design cost in Maltby?
Design comes with the job: the survey, layout and itemised quote are free. In Maltby, a complete designed, supplied and fitted bathroom typically costs £6,000–£11,250 including VAT. Labour costs in Yorkshire and the Humber put local prices at about 7% below the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Maltby including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Maltby
In Maltby we cover S25 and S66; we also cover Dinnington, 3.5 miles away, and Conisbrough.
Being a smaller town does not change how we work in Maltby: free survey, written quote, one team. A design survey in Maltby covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork. If you are in Maltby and weighing a bath against a walk-in shower, the layout options show both with their prices.
Most of South Yorkshire has moderately hard water. Easy-clean glass and good-quality brassware are money well spent. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- A written, itemised quote, with the price fixed in writing once the layout and products are agreed
Decisions to make first
Tile setting-out
Centring tiles on the window, basin or niche avoids thin slivers at the edges. Large tiles mean fewer joints but need flatter walls.
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

