- Postcode districts
- CR3, CR6, RH9
- Nearby
- Coulsdon, Purley and Redhill
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Surrey
- Survey
- Free, at your home
What does a new bathroom design cost in Caterham?
Design comes with the job: the survey, layout and itemised quote are free. In Caterham, a complete designed, supplied and fitted bathroom typically costs £7,300–£13,500 including VAT. Labour costs in South East England put local prices at about 12% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Caterham including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Caterham
We cover every part of Caterham, including CR3, CR6 and RH9, and nearby Coulsdon (3.7 miles) and Purley (4 miles).
Caterham gets the same process as anywhere else: a free survey at your home and a written, itemised quote. For loft rooms and sloping ceilings in Caterham homes, the design checks head height where you stand, not just the floor area. If you are in Caterham and weighing a bath against a walk-in shower, the layout options show both with their prices.
Most of Surrey has hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- A clear view of which changes are cheap and which mean moving drainage or opening floors
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
Decisions to make first
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

