- Postcode districts
- NE1, NE2, NE3, NE4
- Nearby
- Gateshead, Felling and Whickham
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Soft across most of Tyne and Wear
- Survey
- Free, at your home
What does a new bathroom design cost in Newcastle upon Tyne?
Design comes with the job: the survey, layout and itemised quote are free. In Newcastle upon Tyne, a complete designed, supplied and fitted bathroom typically costs £5,800–£10,750 including VAT. Prices in North East England run at about 10% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Newcastle upon Tyne including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Newcastle upon Tyne
In Newcastle upon Tyne we cover NE1, NE2, NE3 and 1 more postcode districts; we also cover Gateshead, 0.9 miles away, and Felling.
Newcastle upon Tyne is a big place with every kind of home, from terraces to flats to new builds, so we never price from a photo alone. Whether you are in Newcastle upon Tyne or elsewhere in Tyne and Wear, layout options come with an itemised written quote. If your Newcastle upon Tyne bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move.
Most of Tyne and Wear is supplied with soft water. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
Decisions to make first
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

