- Postcode districts
- CV10, CV11
- Nearby
- Bedworth, Hinckley and Earl Shilton
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Hard across most of Warwickshire
- Survey
- Free, at your home
What does a new bathroom design cost in Nuneaton?
Design comes with the job: the survey, layout and itemised quote are free. In Nuneaton, a complete designed, supplied and fitted bathroom typically costs £6,400–£11,750 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Nuneaton including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Nuneaton
We cover every part of Nuneaton, including CV10 and CV11, and nearby Bedworth (3.1 miles) and Hinckley (3.9 miles).
Nuneaton has a wide mix of house ages, so the survey is where we spot old lead pipework, weak joists or a tight soil stack. For loft rooms and sloping ceilings in Nuneaton homes, the design checks head height where you stand, not just the floor area. If your Nuneaton bathroom has a soil stack in an awkward corner, the design starts there, because it is the one point that is costly to move.
Most of Warwickshire has hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
Decisions to make first
Where the shower goes
A shower on an outside wall is easier to ventilate; one under a sloping ceiling needs full head height where you stand, not just at the high side.
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

