- Postcode districts
- B77, B78
- Nearby
- Lichfield, Sutton Coldfield and Aldridge
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Moderately hard across most of Staffordshire
- Survey
- Free, at your home
What does a new bathroom design cost in Tamworth?
Design comes with the job: the survey, layout and itemised quote are free. In Tamworth, a complete designed, supplied and fitted bathroom typically costs £6,400–£11,750 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Tamworth including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Tamworth
As well as Tamworth itself (B77 and B78), we survey in Lichfield, Sutton Coldfield and Aldridge.
Tamworth has a wide mix of house ages, so the survey is where we spot old lead pipework, weak joists or a tight soil stack. Whether you are in Tamworth or elsewhere in Staffordshire, layout options come with an itemised written quote. We measure Tamworth bathrooms on site before drawing anything, so layouts are based on your walls rather than a standard plan.
Supplies across most of Staffordshire are moderately hard. Easy-clean glass and good-quality brassware are money well spent. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A measured survey of the room, including ceiling heights, slopes, window and door positions and any boxing
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A conversation about who uses the room, when, and what does not work about the current one
Decisions to make first
The door
Re-hanging the door on the other side, fitting a sliding pocket door or moving the opening can free up a whole wall in a small room.
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

