- Postcode districts
- WS9
- Nearby
- Walsall, Bloxwich and Sutton Coldfield
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Varies across the West Midlands
- Survey
- Free, at your home
What does a new bathroom design cost in Aldridge?
Design comes with the job: the survey, layout and itemised quote are free. In Aldridge, a complete designed, supplied and fitted bathroom typically costs £6,400–£11,750 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Written, itemised quote
Detailed design
- Elevations and tile layouts
Full project
- One contract and one team
Guide prices for Aldridge including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Aldridge
We work right across Aldridge — WS9 — and in neighbouring Walsall and Bloxwich.
In Aldridge, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. We measure Aldridge bathrooms on site before drawing anything, so layouts are based on your walls rather than a standard plan. A design survey in Aldridge covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork.
Water hardness varies across the West Midlands: some supplies are soft, others moderately hard or hard. Easy-clean glass and good-quality brassware are money well spent. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A conversation about who uses the room, when, and what does not work about the current one
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- Elevations and tile layouts on a design, supply and fit project, so the setting-out is agreed before tiling starts
- A product list covering the suite, brassware, furniture, tiles, lighting and ventilation
Decisions to make first
Keep or change the layout
Keeping the WC and shower where they are saves on plumbing. The WC is the costly one to move, because it is tied to the soil stack.
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

