- Postcode districts
- B72, B73, B75
- Nearby
- Washwood Heath, Aldridge and Aston
- Guide price
- Included with supply and fit
- Typical time on site
- survey visit plus design
- Water
- Varies across the West Midlands
- Survey
- Free, at your home
What does a new bathroom design cost in Sutton Coldfield?
Design comes with the job: the survey, layout and itemised quote are free. In Sutton Coldfield, a complete designed, supplied and fitted bathroom typically costs £6,400–£11,750 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Survey and layout
- Layout options on paper
Detailed design
- Lighting and electrical plan
Full project
- Design, supply and fit
Guide prices for Sutton Coldfield including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Sutton Coldfield
As well as Sutton Coldfield itself (B72, B73 and B75), we survey in Washwood Heath, Aldridge and Aston.
Across a large town like Sutton Coldfield, homes range from older terraces to newer estates; the survey tells us which pipework and floor we are dealing with. A design survey in Sutton Coldfield covers drainage, supplies, electrics and ventilation, so nothing on the drawing is guesswork. If you are in Sutton Coldfield and weighing a bath against a walk-in shower, the layout options show both with their prices.
Water hardness varies across the West Midlands: some supplies are soft, others moderately hard or hard. Easy-clean glass and good-quality brassware are money well spent. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Checks on the soil stack, waste routes, joist direction, water pressure, hot water system and existing electrics
- A lighting and electrical plan showing switches, fittings, shaver socket and extractor fan
- Layout options drawn to scale, showing the bath or shower, WC, basin, storage and towel rail
- A clear view of which changes are cheap and which mean moving drainage or opening floors
Decisions to make first
Planning for later
Timber noggins in the walls for future grab rails, a wider door or a level shower floor cost far less to build in now than to add later.
Tile setting-out
Centring tiles on the window, basin or niche avoids thin slivers at the edges. Large tiles mean fewer joints but need flatter walls.
Rules that apply in England
In England, a new connection to the soil stack or new drainage can be building regulations work under Part H, and new circuits or alterations to circuits in the bathroom are notifiable under Part P. Where a new bathroom is formed, Approved Document F asks for extract at 15 l/s intermittent or 8 l/s continuous.

