- Postcode districts
- GL5, GL6, GL10
- Nearby
- Gloucester, Cirencester and Cheltenham
- Guide price
- £2,200–£6,100
- Typical time on site
- 4–8 working days
- Water
- Hard across most of Gloucestershire
- Survey
- Free, at your home
What does bathroom fitting cost in Stroud?
Our guide price for bathroom fitting in Stroud is £2,200–£6,100 including VAT. The figure depends on the size of the room, whether anything moves, and the products you pick.
Fit only, same layout
- You supply the suite and tiles
Fit only, new layout
- Boarding and tiling labour
Supply and fit
- See complete fitted bathrooms
Guide prices for Stroud including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Stroud
We work right across Stroud — GL5, GL6 and GL10 — and in neighbouring Gloucester and Cirencester.
In Stroud, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. We survey in Stroud before quoting fit-only work, so the soil stack, supplies and walls are checked against the products you have chosen. Landlords with flats or houses in Stroud can supply their own standard suites and have them fitted between tenancies.
Most of Gloucestershire has hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Unpacking and checking delivered items before day one, so damage or missing parts can go back to the seller early
- Boarding, tanking in the shower area and tiling labour, with tiles and adhesive from you or sourced by us
- A survey of the room, the supplies and drainage, and the products you plan to use
- Fitting the suite, furniture, screen and accessories, then silicone, testing and a clean handover
Decisions to make first
Who buys the materials
Adhesive, grout, boards, tanking, wastes and fixings can come from you or from us. The quote says which, so nothing is assumed.
Same layout or new
Keeping the layout keeps labour in the £2,200 to £4,000 range; moving the WC, shower or basin adds pipework and days.
Rules that apply in England
In England, the Water Supply (Water Fittings) Regulations 1999 apply to the products you supply as well as to the installation. Electrical changes such as new lights or a fan are notifiable under Part P and are done by a registered electrician or notified to building control. New drainage or a new connection to the soil stack can be Part H work.