- Postcode districts
- CR4, SM4, SW17
- Nearby
- Morden, Wimbledon and Streatham
- Guide price
- £2,800–£7,500
- Typical time on site
- 4–8 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does bathroom fitting cost in Mitcham?
For Mitcham, our guide range for bathroom fitting is £2,800 to £7,500 including VAT. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Fit only, same layout
- Tiling labour
Fit only, new layout
- Pipework and waste re-routed
Supply and fit
- One price for everything
Guide prices for Mitcham including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Mitcham
As well as Mitcham itself (CR4, SM4 and SW17), we survey in Morden, Wimbledon and Streatham.
In Mitcham, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. For Mitcham bathrooms keeping the same layout, fit-only is the cheaper route, because the pipework stays largely where it is. If your Mitcham home runs on a combi boiler or an unvented cylinder, we check your chosen shower valve suits it before fitting.
Water across much of Greater London is very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A check of your product list against the room and the plumbing before the job is booked
- Fitting the suite, furniture, screen and accessories, then silicone, testing and a clean handover
- First and second-fix plumbing: supplies, wastes, isolation valves and the connection to the soil stack
- Boarding, tanking in the shower area and tiling labour, with tiles and adhesive from you or sourced by us
Decisions to make first
Tiling
Some customers tile themselves or use a separate tiler. That can work, but the order of trades and who tanks the shower area must be agreed first.
Same layout or new
Keeping the layout keeps labour in the £2,200 to £4,000 range; moving the WC, shower or basin adds pipework and days.
Rules that apply in England
In England, the Water Supply (Water Fittings) Regulations 1999 apply to the products you supply as well as to the installation. Electrical changes such as new lights or a fan are notifiable under Part P and are done by a registered electrician or notified to building control. New drainage or a new connection to the soil stack can be Part H work.

