- Postcode districts
- CR4, SM4, SW17
- Nearby
- Morden, Wimbledon and Streatham
- Guide price
- £750–£5,000
- Typical time on site
- 1–5 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does bathroom plumbing work cost in Mitcham?
In Mitcham, bathroom plumbing work typically costs £750–£5,000 including VAT, based on London prices. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Like-for-like
- Pressure test
Partial re-route
- Basin or shower moved
New layout
- Pumped waste or macerator
Guide prices for Mitcham including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Mitcham
As well as Mitcham itself (CR4, SM4 and SW17), we survey in Morden, Wimbledon and Streatham.
London homes in Mitcham often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. If your Mitcham home has a gravity system with a loft tank, we check the head of water before recommending a shower or a pump. In Mitcham flats, any change to the WC or wastes is planned with the lease and the flat below in mind.
Supplies across most of Greater London are very hard. Taps, plug wastes and toilet pans scale up quickly, so chrome copes better than matt black, and a removable aerator is worth having. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- The WC connected to the soil stack, or a new branch where the WC is moving
- New hot and cold pipework in copper or plastic, properly clipped, and insulated where it runs through cold spaces
- Draining down and isolating supplies, with the rest of the house back on water as soon as possible
- Basin, bath and shower wastes sized and laid to a steady fall, with traps that hold their water seal
Decisions to make first
Shower supply
Combi boilers and unvented cylinders give mains pressure. A gravity system with a cold tank may need a pump, but a pump must never be connected to the mains.
Copper or plastic
Copper is rigid and suits pipes on show or near the boiler. Plastic is quicker under floors and inside walls, and long runs need fewer joints.
Rules that apply in England
In England, the Water Supply (Water Fittings) Regulations 1999 apply. New drainage or a new connection to the soil stack can be building regulations work under Part H, and a macerator or pumped WC is acceptable only where there is also a WC on gravity drainage elsewhere in the home.

