- Postcode districts
- CR0, CR2, CR9
- Nearby
- Croydon, Purley and Carshalton
- Guide price
- £750–£5,000
- Typical time on site
- 1–5 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does bathroom plumbing work cost in South Croydon?
Guide price in South Croydon: £750–£5,000 including VAT, depending on the room and what you choose. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Like-for-like
- New suite in the same positions
Partial re-route
- New hot and cold runs
New layout
- Pump or pressure upgrade
Guide prices for South Croydon including VAT. Your itemised written quote after the free survey is the price that counts.
Working in South Croydon
As well as South Croydon itself (CR0, CR2 and CR9), we survey in Croydon, Purley and Carshalton.
London homes in South Croydon often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. For South Croydon homes on a combi boiler, we measure the flow rate at the bathroom before you choose a shower valve. Plumbing surveys in South Croydon include a look at the existing pipework for lead, corrosion or poor support before we quote.
Supplies across most of Greater London are very hard. Taps, plug wastes and toilet pans scale up quickly, so chrome copes better than matt black, and a removable aerator is worth having. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- The WC connected to the soil stack, or a new branch where the WC is moving
- Shower pumps on gravity systems, and macerators or pumped wastes where gravity drainage cannot reach
- Isolation valves on every fitting, so taps, cisterns and valves can be serviced without draining the system
- A check of your hot water system, and the pressure and flow rate at the bathroom
Decisions to make first
Shower supply
Combi boilers and unvented cylinders give mains pressure. A gravity system with a cold tank may need a pump, but a pump must never be connected to the mains.
Copper or plastic
Copper is rigid and suits pipes on show or near the boiler. Plastic is quicker under floors and inside walls, and long runs need fewer joints.
Rules that apply in England
In England, the Water Supply (Water Fittings) Regulations 1999 apply. New drainage or a new connection to the soil stack can be building regulations work under Part H, and a macerator or pumped WC is acceptable only where there is also a WC on gravity drainage elsewhere in the home.

