- Postcode districts
- GU47, RG40, RG45
- Nearby
- Sandhurst, Yateley and Camberley
- Guide price
- £8,400–£16,750
- Typical time on site
- 8–15 working days
- Water
- Hard across most of Berkshire
- Survey
- Free, at your home
What does a bathroom renovation cost in Crowthorne?
Our guide price for a bathroom renovation in Crowthorne is £8,400–£16,750 including VAT. Prices in South East England run at about 12% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Make good and decorate
Full renovation
- Back to brick or studwork
Structural
- New drainage route
Guide prices for Crowthorne including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Crowthorne
In Crowthorne we cover GU47, RG40 and RG45; we also cover Sandhurst, 1.6 miles away, and Yateley.
Homes in and around Crowthorne vary, so we look at the floor, the walls and the water system before we price anything. A renovation survey in Crowthorne looks behind the surfaces, at joists, pipework and wiring, before any figure is put on paper. If your Crowthorne home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense.
Supplies across most of Berkshire are hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
- New hot and cold pipework and wastes, with isolation valves to each fitting
- A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
Decisions to make first
Plaster or boards
Plaster suits dry walls that will be painted. Cement-based tile backer boards are the better base behind showers and under heavy tiles.
Pipe material
Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

