Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Hampshire · GU46

Bathroom renovation in Yateley

Looking for a bathroom renovation in Yateley? We design, supply and fit bathrooms across Hampshire, starting with a free home survey and an itemised written quote.

£8,400–£16,750 inc VAT8–15 working daysFree home survey
Bathroom stripped back and being renovated with new boards and pipework, example for Yateley
Postcode districts
GU46
Nearby
Sandhurst, Crowthorne and Camberley
Guide price
£8,400–£16,750
Typical time on site
8–15 working days
Water
Hard across most of Hampshire
Survey
Free, at your home

What does a bathroom renovation cost in Yateley?

In Yateley, a bathroom renovation typically costs £8,400–£16,750 including VAT, based on South East England prices. Prices in South East England run at about 12% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.

Refresh

£5,600–£9,000
  • Re-tile and re-floor

Structural

£13,500–£24,750
  • Walls moved or rooms combined

Guide prices for Yateley including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Yateley

In Yateley we cover GU46; we also cover Sandhurst, 1.9 miles away, and Crowthorne.

Being a smaller town does not change how we work in Yateley: free survey, written quote, one team. If your Yateley home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense. If you have just bought a house in Yateley, renovating the bathroom before moving in saves living through the dust.

Water across much of Hampshire is hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • Re-plastering or boarding, with cement-based boards and tanking in the wet areas
  • New hot and cold pipework and wastes, with isolation valves to each fitting
  • Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
  • New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician

Decisions to make first

Plaster or boards

Plaster suits dry walls that will be painted. Cement-based tile backer boards are the better base behind showers and under heavy tiles.

How far back to strip

Back to brick gives a clean start. Keeping sound plaster on some walls saves time and money, and the survey shows which walls can stay.

Rules that apply in England

In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

More about bathroom renovation

Bathroom renovation in Yateley: questions

How much should I budget for a bathroom renovation in Yateley?

A bathroom renovation in Yateley usually costs £8,400–£16,750 including VAT. Where you land in that range depends on the size of the room, whether the layout changes and the products you choose. After the free survey you get an itemised written quote, and the price is fixed in writing once the layout and products are agreed.

Is the water hard in Yateley?

Water across much of Hampshire is hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

Who handles building control for a bathroom renovation in Yateley?

Building control for Yateley is handled by the local council or an approved inspector. If your job needs sign-off — for example a new circuit, new drainage or a new extractor where there was none — we tell you at the survey and handle the notification as part of the work.

How long does a bathroom renovation take?

Allow 8–15 working days on site for most jobs, plus the lead time for products after you approve the quote. We give you a day-by-day plan before work starts in Yateley.

Should I renovate the bathroom before or after other building work?

If you are also rewiring, replacing the boiler or replumbing the house, do the bathroom at the same time as those works or straight after their first fix. New pipes and cables are then run once, and fresh tiles are not disturbed later.

Bathroom renovation in Yateley

Book a free home survey in Yateley. You get a measured layout and an itemised written price before anything is ordered.