- Postcode districts
- GU13, GU51, GU52
- Nearby
- Farnborough, Aldershot and Yateley
- Guide price
- £8,400–£16,750
- Typical time on site
- 8–15 working days
- Water
- Hard across most of Hampshire
- Survey
- Free, at your home
What does a bathroom renovation cost in Fleet?
As a guide, budget £8,400 to £16,750 including VAT for a bathroom renovation in Fleet; your written quote will pin it down. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Make good and decorate
Full renovation
- Back to brick or studwork
Structural
- New drainage route
Guide prices for Fleet including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Fleet
As well as Fleet itself (GU13, GU51 and GU52), we survey in Farnborough, Aldershot and Yateley.
In Fleet, as anywhere, the age of the house decides a lot: pipe sizes, floor construction and where the soil stack runs. A renovation survey in Fleet looks behind the surfaces, at joists, pipework and wiring, before any figure is put on paper. If your Fleet home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense.
Water across much of Hampshire is hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
- Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
- A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
Decisions to make first
Combining rooms
Taking out the wall between a bathroom and a separate WC gives one larger room, but it is structural work and may need building control.
Pipe material
Copper suits exposed runs and the area near the boiler. Plastic pipe is quicker under floors and inside walls, and long runs need fewer joints.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

