Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Hampshire · GU11

Bathroom renovation in Aldershot

Thinking about a bathroom renovation in Aldershot? Here is what it usually costs locally, what the work involves and how we go about it.

£8,400–£16,750 inc VAT8–15 working daysFree home survey
Bathroom stripped back and being renovated with new boards and pipework, example for Aldershot
Postcode districts
GU11
Nearby
Farnham, Farnborough and Fleet
Guide price
£8,400–£16,750
Typical time on site
8–15 working days
Water
Hard across most of Hampshire
Survey
Free, at your home

What does a bathroom renovation cost in Aldershot?

Guide price in Aldershot: £8,400–£16,750 including VAT, depending on the room and what you choose. We adjust the national guide for South East England, where prices are typically about 12% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.

Refresh

£5,600–£9,000
  • Same layout, new suite

Structural

£13,500–£24,750
  • Ventilation and lighting redesigned

Guide prices for Aldershot including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Aldershot

We cover every part of Aldershot, including GU11, and nearby Farnham (2.8 miles) and Farnborough (3.2 miles).

Homes in and around Aldershot vary, so we look at the floor, the walls and the water system before we price anything. A renovation survey in Aldershot looks behind the surfaces, at joists, pipework and wiring, before any figure is put on paper. Whether your Aldershot bathroom needs a refresh or a full strip back to brick, the written quote shows both where both are realistic.

Water across much of Hampshire is hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
  • New hot and cold pipework and wastes, with isolation valves to each fitting
  • A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
  • Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier

Decisions to make first

Plaster or boards

Plaster suits dry walls that will be painted. Cement-based tile backer boards are the better base behind showers and under heavy tiles.

Shower floor

With the floor already up, a renovation is the easiest time to form a level shower floor or a full wet room.

Rules that apply in England

In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

More about bathroom renovation

Bathroom renovation in Aldershot: questions

What is the price of a bathroom renovation in Aldershot?

A bathroom renovation in Aldershot usually costs £8,400–£16,750 including VAT. Room size, layout changes and your choice of products move the figure within that range. The free survey gives you an itemised quote, fixed in writing once the details are agreed.

How long does a bathroom renovation take?

Allow 8–15 working days on site for most jobs, plus the lead time for products after you approve the quote. We give you a day-by-day plan before work starts in Aldershot.

Is the home survey in Aldershot really free?

Yes. We visit, measure the room, check the pipework, drainage and electrics, and talk through what you want. You then get a written, itemised quote with no obligation to go ahead.

Do you cover GU11 in Aldershot?

Yes. We cover all of Aldershot, including GU11, and nearby Farnham, Farnborough and Fleet. Survey visits are free and arranged at a time that suits you.

Should I renovate the bathroom before or after other building work?

If you are also rewiring, replacing the boiler or replumbing the house, do the bathroom at the same time as those works or straight after their first fix. New pipes and cables are then run once, and fresh tiles are not disturbed later.

Bathroom renovation in Aldershot

Book a free home survey in Aldershot. You get a measured layout and an itemised written price before anything is ordered.