- Postcode districts
- BT63, BT64, BT65, BT66, BT67
- Nearby
- Portadown, Banbridge and Armagh
- Guide price
- £6,600–£13,250
- Typical time on site
- 8–15 working days
- Water
- Soft across most of County Armagh
- Survey
- Free, at your home
What does a bathroom renovation cost in Craigavon?
Guide price in Craigavon: £6,600–£13,250 including VAT, depending on the room and what you choose. Prices in Northern Ireland run at about 12% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Make good and decorate
Full renovation
- Back to brick or studwork
Structural
- New drainage route
Guide prices for Craigavon including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Craigavon
We work right across Craigavon — BT63, BT64, BT65 and 2 more postcode districts — and in neighbouring Portadown and Banbridge.
Homes in and around Craigavon vary, so we look at the floor, the walls and the water system before we price anything. For listed and period properties in Craigavon, we check early whether listed building consent applies to the work you have in mind. Whether your Craigavon bathroom needs a refresh or a full strip back to brick, the written quote shows both where both are realistic.
Water across much of County Armagh is soft. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- New hot and cold pipework and wastes, with isolation valves to each fitting
- Repairs to rotten floorboards, joists or other timber found once the room is open
- Re-plastering or boarding, with cement-based boards and tanking in the wet areas
- A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
Decisions to make first
Shower floor
With the floor already up, a renovation is the easiest time to form a level shower floor or a full wet room.
How far back to strip
Back to brick gives a clean start. Keeping sound plaster on some walls saves time and money, and the survey shows which walls can stay.
Rules that apply in Northern Ireland
In Northern Ireland, building control covers drainage, structural changes and ventilation, with ventilation set out in Technical Booklet K. There is no Part P, but new wiring should be designed, tested and certified to BS 7671.

