Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
County Tyrone · BT68

Bathroom renovation in Dungannon

If you are planning a bathroom renovation in Dungannon, the first step is a free survey visit: we measure, check your pipework and electrics, and give you a written quote.

£6,600–£13,250 inc VAT8–15 working daysFree home survey
Bathroom stripped back and being renovated with new boards and pipework, example for Dungannon
Postcode districts
BT68, BT69, BT70, BT71
Nearby
Cookstown, Armagh and Portadown
Guide price
£6,600–£13,250
Typical time on site
8–15 working days
Water
Soft across most of County Tyrone
Survey
Free, at your home

What does a bathroom renovation cost in Dungannon?

For Dungannon, our guide range for a bathroom renovation is £6,600 to £13,250 including VAT. Prices in Northern Ireland run at about 12% below the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.

Refresh

£4,400–£7,000
  • Make good and decorate

Structural

£10,500–£19,250
  • New drainage route

Guide prices for Dungannon including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Dungannon

In Dungannon we cover BT68, BT69, BT70 and 1 more postcode districts; we also cover Cookstown, 9.7 miles away, and Armagh.

Being a smaller town does not change how we work in Dungannon: free survey, written quote, one team. For listed and period properties in Dungannon, we check early whether listed building consent applies to the work you have in mind. If your Dungannon home is older and the bathroom still has original pipework or plaster behind the tiles, the survey shows whether a renovation or a refit makes more sense.

Most of County Tyrone is supplied with soft water. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • New hot and cold pipework and wastes, with isolation valves to each fitting
  • Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
  • New wiring, lighting, extractor fan and RCD protection, installed and certified by a qualified electrician
  • Repairs to rotten floorboards, joists or other timber found once the room is open

Decisions to make first

How far back to strip

Back to brick gives a clean start. Keeping sound plaster on some walls saves time and money, and the survey shows which walls can stay.

Combining rooms

Taking out the wall between a bathroom and a separate WC gives one larger room, but it is structural work and may need building control.

Rules that apply in Northern Ireland

In Northern Ireland, building control covers drainage, structural changes and ventilation, with ventilation set out in Technical Booklet K. There is no Part P, but new wiring should be designed, tested and certified to BS 7671.

More about bathroom renovation

Bathroom renovation in Dungannon: questions

How much should I budget for a bathroom renovation in Dungannon?

A bathroom renovation in Dungannon usually costs £6,600–£13,250 including VAT. Room size, layout changes and your choice of products move the figure within that range. The free survey gives you an itemised quote, fixed in writing once the details are agreed.

Is the water hard in Dungannon?

Most of County Tyrone is supplied with soft water. That leaves you free to choose matt black, brushed brass or clear glass without worrying much about limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.

Does a bathroom renovation in Dungannon need building control approval?

Building control in Dungannon is run by the local district council. Where approval is needed, for example for new drainage, we tell you at the survey and handle it as part of the job.

How long does a bathroom renovation take?

Allow 8–15 working days on site for most jobs, plus the lead time for products after you approve the quote. We give you a day-by-day plan before work starts in Dungannon.

Can I live in the house during a bathroom renovation?

Yes, most people do. Expect dust, noise and the water to be off for short spells, and plan for no bath or shower in that room for two to three weeks. If it is your only toilet, talk to us at the survey about keeping a WC working for as much of the job as possible.

Bathroom renovation in Dungannon

Book a free home survey in Dungannon. You get a measured layout and an itemised written price before anything is ordered.