- Postcode districts
- SE3, SE7, SE10, SE12
- Nearby
- Blackheath, Canary Wharf and Catford
- Guide price
- £9,400–£18,750
- Typical time on site
- 8–15 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a bathroom renovation cost in Greenwich?
In Greenwich, a bathroom renovation typically costs £9,400–£18,750 including VAT, based on London prices. Labour costs in London put local prices at about 25% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Refresh
- Re-tile and re-floor
Full renovation
- New layout options
Structural
- Walls moved or rooms combined
Guide prices for Greenwich including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Greenwich
In Greenwich we cover SE3, SE7, SE10 and 1 more postcode districts; we also cover Blackheath, 1.2 miles away, and Canary Wharf.
In Greenwich, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. Whether your Greenwich bathroom needs a refresh or a full strip back to brick, the written quote shows both where both are realistic. For listed and period properties in Greenwich, we check early whether listed building consent applies to the work you have in mind.
Water across much of Greater London is very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A survey of the structure and services: joists, walls, ceilings, pipework, wastes, wiring and ventilation
- Repairs to rotten floorboards, joists or other timber found once the room is open
- Strip-out back to brick or studwork, with waste taken away by a licensed waste carrier
- Layout changes such as moved doors, new stud walls or boxing for concealed cisterns
Decisions to make first
Shower floor
With the floor already up, a renovation is the easiest time to form a level shower floor or a full wet room.
How far back to strip
Back to brick gives a clean start. Keeping sound plaster on some walls saves time and money, and the survey shows which walls can stay.
Rules that apply in England
In England, structural changes, new drainage or a new connection to the soil stack under Part H, and new circuits under Part P can all be building regulations work. A registered electrician can self-certify the electrics; structural and drainage work may need a building notice or a full plans application to building control.

