Fitted bathrooms in Greenwich
We work right across Greenwich — SE3, SE7, SE10 and SE12 — and in neighbouring Blackheath and Canary Wharf.
- Postcode districts
- SE3, SE7, SE10, SE12
- Nearby towns
- Blackheath, Canary Wharf and Catford
- County / area
- Greater London
- New bathroom guide
- £8,100–£15,000
- Water
- Very hard across most of Greater London
- Larger town nearby
- Canary Wharf, 2 miles
What we fit in Greenwich

Shower installation
If you want a shower in your Greenwich home that works when the boiler is off, an electric shower is worth considering, as long as the consumer unit can take the circuit.
From £550 inc VAT
Prices and details
Bathroom tiling
If you want a tiled shower floor in your Greenwich bathroom, the tanking and drainage are planned before the tile is chosen.
From £55 per m² inc VAT
Prices and details
Bathroom strip-out
Strip-outs in Greenwich include the waste going away with a licensed carrier, so nothing is left on the drive or the pavement.
From £750 inc VAT
Prices and detailsBathroom prices in Greenwich
Prices in Greenwich run at about 25% above the UK guide, based on London labour rates.
| Room or job | Guide price inc VAT | Time on site |
|---|---|---|
| Cloakrooms & downstairs WCs | £2,200–£5,600 | 2–4 working days |
| Fitted bathrooms | £8,100–£15,000 | 6–10 working days |
| En-suites | £5,600–£11,250 | 4–8 working days |
| Shower rooms | £5,600–£11,250 | 4–8 working days |
| Wet rooms | £7,500–£15,000 | 5–10 working days |
| Family bathrooms | £7,500–£13,750 | 6–10 working days |
Homes and water in Greenwich
In Greenwich, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price.
Most of Greater London has very hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
Bathrooms in Greenwich: questions
Does Greenwich have hard or soft water?
Most of Greater London has very hard water. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
How much does a new bathroom cost in Greenwich?
A fitted bathroom in Greenwich typically costs £8,100–£15,000 including VAT, supplied and installed. Smaller jobs cost less: a walk-in shower is usually £3,100–£7,500 and a cloakroom £2,200–£5,600.
Will my bathroom in Greenwich need council approval?
Building control for Greenwich is handled by the local council or an approved inspector. If your bathroom needs sign-off — for example a new circuit, new drainage or a new extractor where there was none — we tell you at the survey and handle it as part of the job.
Do you cover all of Greenwich?
Yes, including SE3, SE7, SE10 and SE12, and nearby Blackheath, Canary Wharf and Catford.
What happens at a survey in Greenwich?
We measure the room, look at the pipework, soil stack, floor and electrics, and talk through what you want. You then get layout options and an itemised written quote. The visit costs nothing.
