- Postcode districts
- SE3, SE7, SE10, SE12
- Nearby
- Blackheath, Canary Wharf and Catford
- Guide price
- £7,500–£15,000
- Typical time on site
- 5–10 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a wet room cost in Greenwich?
For Greenwich, our guide range for a wet room is £7,500 to £15,000 including VAT. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Full tanking, porcelain tiles
Signature
- 4–7 m² room
Large or luxury
- Large-format or stone-effect tiles
Guide prices for Greenwich including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Greenwich
As well as Greenwich itself (SE3, SE7, SE10 and 1 more postcode districts), we survey in Blackheath, Canary Wharf and Catford.
In Greenwich, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. If your Greenwich home has a concrete ground floor, a downstairs wet room may need the screed cut out to set the drain. If your Greenwich bathroom is upstairs on timber joists, we check their size and direction before planning the wet room floor.
Water across much of Greater London is very hard. If your supply in Greenwich is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Extractor fan and lighting by a qualified electrician, tested and certified, with underfloor heating if you choose it
- A thermostatic shower valve, exposed or concealed, with heads to suit your water system
- Strip-out, waste removal, a final flow test to the drain and handover
- A pre-formed floor former with a linear or centre drain, or a screed laid to fall
Decisions to make first
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Linear or centre drain
A linear drain along one wall lets the floor fall in a single direction, so large tiles can be laid without awkward cuts. A centre drain needs a four-way fall and suits smaller tiles or mosaic.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

