- Postcode districts
- E3, E14, SE16
- Nearby
- Bow, Canning Town and Greenwich
- Guide price
- £7,500–£15,000
- Typical time on site
- 5–10 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a wet room cost in Canary Wharf?
In Canary Wharf, a wet room typically costs £7,500–£15,000 including VAT, based on London prices. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Compact
- Floor former and linear or centre drain
Signature
- Underfloor heating option
Large or luxury
- Full conversion of a larger room
Guide prices for Canary Wharf including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Canary Wharf
We cover every part of Canary Wharf, including E3, E14 and SE16, and nearby Bow (1.5 miles) and Canning Town (1.8 miles).
In Canary Wharf, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. If your Canary Wharf home has a concrete ground floor, a downstairs wet room may need the screed cut out to set the drain. We quote wet rooms in Canary Wharf only after looking at the floor construction, because that is where most of the cost difference lies.
Most of Greater London has very hard water. If your supply in Canary Wharf is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Full tanking of the floor and the shower walls, with sealed corners, pipe collars and a sealed drain connection
- A survey of the floor construction, the joist size and direction or the concrete slab, and the route to the soil stack
- A pre-formed floor former with a linear or centre drain, or a screed laid to fall
- A thermostatic shower valve, exposed or concealed, with heads to suit your water system
Decisions to make first
Underfloor heating
Electric underfloor heating under the tiles dries the floor quickly after a shower; it is typically £700 to £1,500 for a bathroom.
Linear or centre drain
A linear drain along one wall lets the floor fall in a single direction, so large tiles can be laid without awkward cuts. A centre drain needs a four-way fall and suits smaller tiles or mosaic.
Rules that apply in England
In England, a new drain connection or changes at the soil stack can be building-regulations work under Part H, and new circuits or changes to the wiring in the room are notifiable under Part P. If the wet room is a newly formed bathroom, Approved Document F requires extract of 15 litres per second intermittent or 8 litres per second continuous.

