- Postcode districts
- SE3, SE7, SE10, SE12
- Nearby
- Blackheath, Canary Wharf and Catford
- Guide price
- £7,500–£13,750
- Typical time on site
- 6–10 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a family bathroom cost in Greenwich?
As a guide, budget £7,500 to £13,750 including VAT for a family bathroom in Greenwich; your written quote will pin it down. Labour costs in London put local prices at about 25% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.
Essential
- White suite, chrome taps
Signature
- Porcelain tiles, heated towel rail
Bespoke
- Separate bath and shower
Guide prices for Greenwich including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Greenwich
We cover every part of Greenwich, including SE3, SE7, SE10 and 1 more postcode districts, and nearby Blackheath (1.2 miles) and Canary Wharf (1.9 miles).
In Greenwich, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. If your Greenwich home has just one bathroom, we plan the fit so the toilet is working again at the end of each day wherever the job allows. We survey in Greenwich before quoting, so the bath, shower and storage are planned around your actual walls, window and soil stack.
Water across much of Greater London is very hard. We plan easy-clean glass, rimless toilets and finishes that do not show limescale. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- A layout that keeps a full-size bath, with options for a shower over it or a separate enclosure if the room allows
- New pipework, wastes and isolation valves, plus a thermostatic shower valve so the temperature holds when someone runs a tap
- Lights, extractor fan and towel rail wired by a qualified electrician, tested and certified
- Moisture-resistant boarding and tanking around the bath and shower before any tiling
Decisions to make first
Shower over the bath or separate
A shower over the bath with a fixed or hinged screen is the most space-efficient. A separate enclosure needs roughly another square metre of floor but means the bath queue no longer holds up the shower queue.
Floor
Matt or textured porcelain is the hardest-wearing option. Luxury vinyl tile (LVT) is warmer, quieter and cheaper to lay. Avoid polished tiles where children climb out of the bath.
Rules that apply in England
In England, any new circuit, or any change to the wiring in a room with a bath or shower, is notifiable under Part P. Part G limits the hot water at a new bath to 48 °C only in a new dwelling or one created by change of use; it does not apply to a replacement bath in an existing house, but a thermostatic valve is a sensible choice where children bathe.

