Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Greater London · SE3

Bath replacement in Greenwich

Bath replacement in Greenwich, planned from measurements taken in your home and priced in writing. We cover SE3, SE7, SE10 and 1 more postcode districts and the surrounding area.

£1,100–£3,100 inc VAT1–2 working daysFree home survey
New bath fitted with a panel, taps and tiled surround, example for Greenwich
Postcode districts
SE3, SE7, SE10, SE12
Nearby
Blackheath, Canary Wharf and Catford
Guide price
£1,100–£3,100
Typical time on site
1–2 working days
Water
Very hard across most of Greater London
Survey
Free, at your home

What does a replacement bath cost in Greenwich?

As a guide, budget £1,100 to £3,100 including VAT for a replacement bath in Greenwich; your written quote will pin it down. Labour costs in London put local prices at about 25% above the UK guide figure. The figure depends on the size of the room, whether anything moves, and the products you pick.

Shower bath

£1,750–£3,100
  • P or L-shaped shower bath

Freestanding bath

£3,100–£7,500
  • Floor or wall-mounted filler

Guide prices for Greenwich including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Greenwich

We cover every part of Greenwich, including SE3, SE7, SE10 and 1 more postcode districts, and nearby Blackheath (1.2 miles) and Canary Wharf (1.9 miles).

In Greenwich, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. Survey visits in Greenwich cover the bath, the tiles around it and the waste route, so the quote reflects your bathroom rather than a standard job. For Greenwich homes with a shower over the bath, a shower bath and fixed screen keeps the floor drier than a curtain.

Supplies across most of Greater London are very hard. Taps, plug wastes and toilet pans scale up quickly, so chrome copes better than matt black, and a removable aerator is worth having. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • Supply of the new bath, taps or filler, waste and overflow, and bath panel
  • New flexible connectors or pipework, with isolation valves on the hot and cold supplies
  • Tile repairs or re-tiling around the bath, and a fixed screen where there is a shower over it
  • Removal of the old bath, including breaking up a cast-iron bath in place where it will not come out whole

Decisions to make first

Acrylic or steel

Acrylic is warm to the touch, light and the usual choice; thicker, reinforced acrylic flexes less. Enamelled steel is rigid and hard-wearing but feels colder, and needs sound-deadening pads to stop it drumming.

Size

Most UK baths are 1700 × 700 mm. Going longer or wider than the old bath means re-tiling and checking that the new one fits up the stairs.

Rules that apply in England

In England, Part G limits the hot water to a new bath to 48 °C at the outlet, usually with a thermostatic mixing valve, but only in a new dwelling or one created by a change of use. It does not apply to a replacement bath in an existing home, though a thermostatic valve is still sensible where children or older people bathe. New wiring for a shower over the bath or new lights is notifiable under Part P.

More about bath replacement

Bath replacement in Greenwich: questions

How much does a replacement bath cost in Greenwich?

A replacement bath in Greenwich usually costs £1,100–£3,100 including VAT. Where you land in that range depends on the size of the room, whether the layout changes and the products you choose. After the free survey you get an itemised written quote, and the price is fixed in writing once the layout and products are agreed.

Is the water hard in Greenwich?

Supplies across most of Greater London are very hard. Taps, plug wastes and toilet pans scale up quickly, so chrome copes better than matt black, and a removable aerator is worth having. Hardness varies street by street, so check the figure for your postcode with your water supplier.

Who handles building control for a replacement bath in Greenwich?

Building control for Greenwich is handled by the local council or an approved inspector. If your job needs sign-off — for example a new circuit, new drainage or a new extractor where there was none — we tell you at the survey and handle the notification as part of the work.

How long does a replacement bath take?

Allow 1–2 working days on site for most jobs, plus the lead time for products after you approve the quote. We give you a day-by-day plan before work starts in Greenwich.

Can I replace my bath with a freestanding bath?

Yes, if the room has space around the bath for cleaning and the floor can carry the weight. The waste and filler usually come up through the floor or from a wall-mounted filler, so floorboards come up at the bath position. Stone resin and cast-iron baths are heavy when full, so we check the joists before you order one.

Bath replacement in Greenwich

Book a free home survey in Greenwich. You get a measured layout and an itemised written price before anything is ordered.