- Postcode districts
- SE3, SE7, SE10, SE12
- Nearby
- Blackheath, Canary Wharf and Catford
- Guide price
- £55–£110 per m²
- Typical time on site
- 2–4 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does bathroom tiling cost in Greenwich?
Our guide price for bathroom tiling in Greenwich is £55–£110 per m² including VAT. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Ceramic
- Standard ceramic wall tiles
Porcelain
- Full height in wet zones
Large-format or stone
- Sealing where needed
Guide prices for Greenwich including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Greenwich
In Greenwich we cover SE3, SE7, SE10 and 1 more postcode districts; we also cover Blackheath, 1.2 miles away, and Canary Wharf.
London homes in Greenwich often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. If you want a tiled shower floor in your Greenwich bathroom, the tanking and drainage are planned before the tile is chosen. For Greenwich flats, we check the lease and the floor build-up before laying hard tiles on a timber floor.
Most of Greater London has very hard water. Hard water leaves white marks on dark grout and gloss tiles, so matt finishes and stain-resistant grout are the practical choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Sealing natural stone and cleaning off grout haze before handover
- Checking walls for flatness and strength, and boarding with cement-based backer board where needed
- Tanking the shower area and the walls around the bath with a waterproof membrane or liquid system
- Grouting, trims or mitred edges, and silicone at internal corners, the bath and the tray
Decisions to make first
Tile size
Large-format tiles mean fewer grout lines but need flat walls and more preparation. Small tiles and mosaics follow uneven surfaces and grip better underfoot.
Edges
Metal or PVC trims are quick and protect tile edges. Mitred edges look cleaner on porcelain and take more labour.
Rules that apply in England
In England, tiling itself is not building regulations work. If it is part of forming a level shower floor with new drainage, that drainage can be Part H work, and any new electrics are covered by Part P.

