- Postcode districts
- E3, E14, SE16
- Nearby
- Bow, Canning Town and Greenwich
- Guide price
- £55–£110 per m²
- Typical time on site
- 2–4 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does bathroom tiling cost in Canary Wharf?
Guide price in Canary Wharf: £55–£110 per m² including VAT, depending on the room and what you choose. Prices in London run at about 25% above the national guide, mainly because of labour rates. The figure depends on the size of the room, whether anything moves, and the products you pick.
Ceramic
- Standard ceramic wall tiles
Porcelain
- Full height in wet zones
Large-format or stone
- Sealing where needed
Guide prices for Canary Wharf including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Canary Wharf
As well as Canary Wharf itself (E3, E14 and SE16), we survey in Bow, Canning Town and Greenwich.
London homes in Canary Wharf often mean stairs, permits and neighbours below; we plan the logistics as carefully as the bathroom. Tiling quotes in Canary Wharf list the tile, the area and the preparation separately, so you can compare like for like. We measure tiled areas in Canary Wharf bathrooms on site, so the quote is based on real square metres.
Most of Greater London has very hard water. Hard water leaves white marks on dark grout and gloss tiles, so matt finishes and stain-resistant grout are the practical choice. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Setting out so cuts are even and joints line up with niches, windows and edges
- Grouting, trims or mitred edges, and silicone at internal corners, the bath and the tray
- Fixing with an adhesive suited to the tile and the surface, with levelling clips for large tiles
- Checking walls for flatness and strength, and boarding with cement-based backer board where needed
Decisions to make first
Floor grip
For a bathroom floor, choose a matt or textured tile with a slip rating of R10 or above. Smaller tiles with more grout lines grip better in a shower.
Edges
Metal or PVC trims are quick and protect tile edges. Mitred edges look cleaner on porcelain and take more labour.
Rules that apply in England
In England, tiling itself is not building regulations work. If it is part of forming a level shower floor with new drainage, that drainage can be Part H work, and any new electrics are covered by Part P.

