Free home survey & written quote · Fitted bathrooms across England, Wales, Scotland & Northern Ireland0800 088 6341
Fitted Bathrooms
Greater London · SE3

Bath to shower conversions in Greenwich

If you are planning a bath to shower conversion in Greenwich, the first step is a free survey visit: we measure, check your pipework and electrics, and give you a written quote.

£2,500–£6,200 inc VAT2–6 working daysFree home survey
Former bath space converted to a walk-in shower, example for Greenwich
Postcode districts
SE3, SE7, SE10, SE12
Nearby
Blackheath, Canary Wharf and Catford
Guide price
£2,500–£6,200
Typical time on site
2–6 working days
Water
Very hard across most of Greater London
Survey
Free, at your home

What does a bath to shower conversion cost in Greenwich?

For Greenwich, our guide range for a bath to shower conversion is £2,500 to £6,200 including VAT. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.

Walk-in shower

£3,800–£6,900
  • Large tray and frameless screen

Level-access floor

£5,600–£10,000
  • Level entry, linear drain

Guide prices for Greenwich including VAT. Your itemised written quote after the free survey is the price that counts.

Working in Greenwich

We cover every part of Greenwich, including SE3, SE7, SE10 and 1 more postcode districts, and nearby Blackheath (1.2 miles) and Canary Wharf (1.9 miles).

In Greenwich, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. If someone in your Greenwich home is finding the bath side harder to step over, a low or level-access tray removes the problem. We check the floor under the bath during a Greenwich survey where we can, because old leaks can leave soft boards.

Water across much of Greater London is very hard. If your supply in Greenwich is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.

What the job includes

  • Repair or replacement of floorboards where the bath has left them soft or damaged
  • A glass enclosure, walk-in panel or frameless screen
  • Grab rails and a fold-down seat if you want them
  • Removal of the bath, panel and taps, and disposal of the waste

Decisions to make first

Your only bath?

If this is the only bath in the house, think about whether you, or a future buyer, will want one before you commit.

How much to re-tile

Re-tile just the shower walls, or take the chance to re-tile the whole room so new and old tiles never have to match.

Rules that apply in England

In England, adding an electric shower usually means a new circuit, which is notifiable under Part P, as is any change to the wiring in the bathroom. Where the conversion is an adaptation for a disabled person, a Disabled Facilities Grant of up to £30,000 may help, but the council must approve it before work starts.

More about bath to shower conversions

Bath to shower conversions in Greenwich: questions

How much should I budget for a bath to shower conversion in Greenwich?

A bath to shower conversion in Greenwich usually costs £2,500–£6,200 including VAT. Where you land in that range depends on the size of the room, whether the layout changes and the products you choose. After the free survey you get an itemised written quote, and the price is fixed in writing once the layout and products are agreed.

Is the water hard in Greenwich?

Water across much of Greater London is very hard. If your supply in Greenwich is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.

Who handles building control for a bath to shower conversion in Greenwich?

Building control for Greenwich is handled by the local council or an approved inspector. If your job needs sign-off — for example a new circuit, new drainage or a new extractor where there was none — we tell you at the survey and handle the notification as part of the work.

How long does a bath to shower conversion take?

Allow 2–6 working days on site for most jobs, plus the lead time for products after you approve the quote. We give you a day-by-day plan before work starts in Greenwich.

Does a bath to shower conversion need a new waste?

Usually the existing bath waste is reused, with the pipe adjusted so the tray outlet has a good fall and a trap suited to a shower. A level-access floor often needs more change under the floor, and occasionally a new connection.

Bath to shower conversions in Greenwich

Book a free home survey in Greenwich. You get a measured layout and an itemised written price before anything is ordered.