- Postcode districts
- SE3, SE7, SE10, SE12
- Nearby
- Blackheath, Canary Wharf and Catford
- Guide price
- £2,500–£6,200
- Typical time on site
- 2–6 working days
- Water
- Very hard across most of Greater London
- Survey
- Free, at your home
What does a bath to shower conversion cost in Greenwich?
For Greenwich, our guide range for a bath to shower conversion is £2,500 to £6,200 including VAT. We adjust the national guide for London, where prices are typically about 25% above the UK average. The figure depends on the size of the room, whether anything moves, and the products you pick.
Tray and enclosure
- Thermostatic shower, re-tiling
Walk-in shower
- Large tray and frameless screen
Level-access floor
- Level entry, linear drain
Guide prices for Greenwich including VAT. Your itemised written quote after the free survey is the price that counts.
Working in Greenwich
We cover every part of Greenwich, including SE3, SE7, SE10 and 1 more postcode districts, and nearby Blackheath (1.2 miles) and Canary Wharf (1.9 miles).
In Greenwich, many bathrooms are in flats or converted houses, so we check lease consents, access and the floor below before we price. If someone in your Greenwich home is finding the bath side harder to step over, a low or level-access tray removes the problem. We check the floor under the bath during a Greenwich survey where we can, because old leaks can leave soft boards.
Water across much of Greater London is very hard. If your supply in Greenwich is the same, limescale on shower glass and heads is a real issue: easy-clean glass, rub-clean nozzles and a squeegee make a big difference. Hardness varies street by street, so check the figure for your postcode with your water supplier.
What the job includes
- Repair or replacement of floorboards where the bath has left them soft or damaged
- A glass enclosure, walk-in panel or frameless screen
- Grab rails and a fold-down seat if you want them
- Removal of the bath, panel and taps, and disposal of the waste
Decisions to make first
Your only bath?
If this is the only bath in the house, think about whether you, or a future buyer, will want one before you commit.
How much to re-tile
Re-tile just the shower walls, or take the chance to re-tile the whole room so new and old tiles never have to match.
Rules that apply in England
In England, adding an electric shower usually means a new circuit, which is notifiable under Part P, as is any change to the wiring in the bathroom. Where the conversion is an adaptation for a disabled person, a Disabled Facilities Grant of up to £30,000 may help, but the council must approve it before work starts.

